Our Technology
WasteX's biochar production machine (Carbonizer Model Y 2.3) is an autothermal continuous-type screw pyrolysis reactor, developed to produce high-quality biochar with minimal use of energy and labor.

Worldwide implementations
WasteX digital MRV

Our clients are equipped with a web app to digitally measure, report, and verify (dMRV) biochar production and application using WasteX's carbonizer for the purpose of carbon credit
Features:
Biochar producer registration and full process recording for the purpose of carbon credits
Web-based and accessible from any device, anywhere
Carbon impact and credits recording and calculation
One-click Annex 1 report generation for carbon credit certification
Feedstock processed by WasteX biochar machine
WasteX biochar machine can convert readily available organic materials such as agricultural waste and forestry residues into biochar.

Wood chips

Rice husk

Corn cobs

Poultry bedding
Key Feedstock Requirements
-
Min. calorific value of 10 MJ/kg
-
Maximum moisture content of 15 wt% (<15 wt% recommended for more optimal performance)
-
Particle size of 30 mm or below
-
Pourable and free flowing
Equipment specifications
Parameters | Unit | Value |
|---|---|---|
Dimensions | 3.5 x 3.4 x 2.4 | meter |
Weight | ~700 | kg |
Materials used | SS 304 | |
Burner temperature | 400-800 | °C |
Pyrolysis temperature | 500-650 | °C |
Processing capacity | 30 - 80 | kg/hour |
Biochar conversion | ~40% | % |
Biochar production rate | ~12 - 32 | kg/hour |
Fuel/feedstock ratio | 15-20%* | % |
Manpower requirements | 2-4 | manhours / day |
*optimal efficiency with min. 8 hours continuous operations
FAQ
Biochar production workflow
Feedstock Preparation
Dry and shred the feedstock to achieve the feedstock requirements. This is essential to ensure optimal performance and maximum biochar yield.
01
Automatic Pyrolysis
The equipment automatically feeds the pyrolysis barrel with feedstock, controls the residence time, and disperses biochar into the biochar bin.
03
Heat Generation
The equipment is ignited to burn the biomass fuel. At 300°C, switch to auto-mode and the equipment will refuel the burner until the equipment reaches 500°C.
02
Biochar Collection
Collect biochar once the bin is full (every ~1 hour), and replace the bin with a new one. Let the biochar cool down for 24 hours.




















